"Your Cost Cutting Solution"

 
Triton Cementing Trailer


Quantity Item Description Unit

Trail Mount Pump Unit- Triton HD-500 Double Pumper RCM Cementing Trailer New 34' Frame Trailer Including: New Axles & Suspension with ABS Brake System Available with 3-3/8", 4.0", 4-1/2" Fluid Ends

  • 8- 11.R22.5 Tires
  • 2- Heavy Duty 500HP Triplex Plunger Pump with 8.0:1 Gear Ratio
  • 2- New 14L Detroit Series 60 / 500 HP
  • Engines w/ Murphy Engine Controls
  • 2- New 5610 Allison Transmissions
  • 2- New Atlas Radiators
  • New Drive Lines- 1810
  • New Perkins 173 HP Pony Engine
  • New Chelsea 3 PTO Gear Box w/ New 800
  • Series PTO's
  • New Mission Magnum 4x3 Centrifugal Pump Packing
  • New Mission Magnum 5x6 Centrifugal Pump Mechanical Packing
  • Serva 4x5 Centrifugal Pump
  • 20- BBL Displacement Tank- Two
  • Compartment Coated w/ Tnemec
  • 8- BBL Mixing Tub Hydraulic Driven Paddles
  • Halco RCM Mixing System
  • Endress- Houser Densitometer
  • MD 16k Pressure Gauges
  • PI2000 Laptop Triplex Pump Display & Printer: with this feature, Engines are set with Pump Pressure Kills & Engine Shuts
  • Down on Low Oil & Water Temp.
  • Control Panel w/ Air Actuators, Valves, Engine Gauges, Transmission Shifters, Work Lights, Pressure Gauges, etc.
  • 3- 8' Loops 1502
  • 2-Style 10 Swings & 3- Style 50 Swings
  • 2- 5000 PSI 2" Hoses
  • 2- 4" Suction Hoses
  • 160' Straight Iron, Non Pressure Seal w/ 1502 Unions
  • Delivery & Warranty:
  • Pump has a 2-year unconditional warranty, Engine and Transmission are Each Warranted For One Year From Delivery
  •